Mt Buller Campus
The Mt Buller Primary School campus is situated in the Alpine Central building on level 2, catering for students from Foundation to grade six level.
The curriculum is linked closely to Mansfield Primary School with a focus on the special alpine environment in which it is located.
Opening each year on the Tuesday after the Queens Birthday long weekend and closing at the end of term 3.
The school requires full time student participation – there is no scope for part time enrolments. The students have two 30 minute breaks which are taken in the Sports Hall facility within the Alpine Central building.
Winter Enrolment 2023 – Mansfield Primary School, Mt Buller Campus
Applications for 2023 are now closed.
The curriculum is linked closely to Mansfield Primary School with a focus on the special alpine environment in which it is located.
Opening each year on the Tuesday after the Queens Birthday long weekend and closing at the end of term 3.
The school requires full time student participation – there is no scope for part time enrolments. The students have two 30 minute breaks which are taken in the Sports Hall facility within the Alpine Central building.
Winter Enrolment 2023 – Mansfield Primary School, Mt Buller Campus
Applications for 2023 are now closed.